Project Info:
Although Wacor completed both phases, Phase 2 consisted of the removal and replacement of 1.5 km of various size storm drainage pipes around the perimeter of runways and taxiways, big bore drilling was called for at an active runway crossing which required the work to be performed at night, a section of upgrades utilized cured in place pipe technology, and the installation of new airfield electrical systems